Case Study: Replacement of 300 Timber Transoms with Composite Transoms IMG_2556

Case Study: Replacement of 300 Timber Transoms with Composite Transoms

Client: Haslin Construction Location: Alligator Creek, QLD (outside Rockhampton) Duration: 8 days in April 2024 Scope

Project: 2023 October Hunter Valley Shut Down IMG_0818resized-forweb

Project: 2023 October Hunter Valley Shut Down

During the last Australian Rail Track Corporation (ARTC) Hunter Valley shut down, Corfad worked on seven job sites ac

Project: Crane Rail Installation Webb Dock SYMAL 3

Project: Crane Rail Installation Webb Dock

Our client, Symal, was engaged as the principal supplier for the construction of 3 new Crane Tracks in Port Melbourne

September 2021: Shepparton Line Upgrade V Line Shepparton Line Sept 2021

September 2021: Shepparton Line Upgrade V Line

Our scope of projects for our client Coleman Rail: Signal cable route above and below ground Track Certification/ Sup

Murray Basin 2018 unnamed (21)

Murray Basin 2018

Following an extended period of consulting to AIFS, working closely with the internal team and gaining a deep understand
Muswellbrook Re-railing 2018 unnamed (9)

Muswellbrook Re-railing 2018

Following an extended period of consulting to AIFS, working closely with the internal team and gaining a deep understand
Conports Siding Upgrade 2017 IMG_0489

Conports Siding Upgrade 2017

Following an extended period of consulting to AIFS, working closely with the internal team and gaining a deep understand
Downer Cardiff Yard Remodel 2017 unnamed (13)

Downer Cardiff Yard Remodel 2017

Following an extended period of consulting to AIFS, working closely with the internal team and gaining a deep understand